Query
Windecker
Type
Entity Briefing
Entity
Windecker
Generated
2026-10-20T01:35:18.639Z

Briefing on Windecker

Entity Briefing
Generated Oct 20, 2026·Dataset freshness not reported
420 MW
Proposed capacity
active
Current status
Wind
Technology
ERCOT
Market / region
2028-04-17
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Windecker is a 420 MW Wind project in Texas, currently active.

Windecker Energy LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-04-17.

Queue ID
ERCOT-28INR0057
Location
Upton, Texas
Technology
Wind
Developer
Windecker Energy LLC
Market / region
ERCOT
Point of interconnection
10058 Catclaw Switch 138kV

What stands out

1

Windecker is a 420 MW Wind project in Texas with status active.

2

Windecker Energy LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2028-04-17.

Market and operating context

Queue date
2024-03-29
Proposed COD
2028-04-17
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Windecker — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0057
LocationUpton, Texas
TechnologyWind
DeveloperWindecker Energy LLC
Market / regionERCOT
Point of interconnection10058 Catclaw Switch 138kV
Queue date2024-03-29
Proposed COD2028-04-17