Query
Wilton Wind II LLC
Type
Entity Briefing
Entity
Wilton Wind II LLC
Summary generated
Oct 17, 2026
First saved
Date not recorded

Briefing on Wilton Wind II LLC

Entity Briefing

Summary generated Oct 17, 2026 (UTC).

Source dates used by this summary were not recorded.

50 MW
Capacity
Operating
Current status
2009
Operating since
1
Generators
46.0%
Capacity factor
200 GWh
Annual generation
Briefing/plantOperating

Wilton Wind II LLC is a 50 MW Onshore Wind Turbine asset in MISO (Midcontinent), currently Operating.

Wilton Wind II LLC is reported in North Dakota since 2009 under NextEra Energy. Available operating and financial measures include 46.0% capacity factor and 200 GWh annual generation; $1895/kW reported CapEx.

Location
Burleigh, North Dakota
Technology
Onshore Wind Turbine
Owner / parent
NextEra Energy
Operator
Wilton Wind II LLC
Grid
MISO (Midcontinent)
Plant ID
57120

What stands out

1

Wilton Wind II LLC is a 50 MW Onshore Wind Turbine asset in North Dakota with status Operating.

2

Latest annual operating measures report 46.0% capacity factor and 200 GWh annual generation.

3

Available financial measures include $1895/kW CapEx.

4

Latest linked story: “Earnings call transcript: NextEra Energy Q1 2026 results beat EPS forecast” (Investing.com, 2026-04-28).

Market and operating context

ISO / market
MISO (Midcontinent)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
MRO
State rank
#36 of 45
National rank
#962 of 1,442

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.