Query
Wildhorse POD Solar
Type
Entity Briefing
Entity
Wildhorse POD Solar
Technology
solar
Generated
2026-10-19T21:15:37.729Z

Briefing on Wildhorse POD Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
10 MW
Proposed capacity
suspended
Current status
Solar
Technology
ERCOT
Market / region
2026-02-28
Proposed COD
In Progress (unknown study)
Queue phase
Briefing/projectsuspended

Wildhorse POD Solar is a 10 MW Solar project in Texas, currently suspended.

Highpeak Solar, LLC is the reported developer. The reported queue phase is In Progress (unknown study). Proposed COD is 2026-02-28.

Queue ID
ERCOT-23INR0537
Location
Howard, Texas
Technology
Solar
Developer
Highpeak Solar, LLC
Market / region
ERCOT
Point of interconnection
TDSP Station Code: WHPOD_x000D_ PTI BUS #: 1397_x000D_ Load/Load TR: LDWHPOD_x000D_ Voltage Level (Transmission): 138kV

What stands out

1

Wildhorse POD Solar is a 10 MW Solar project in Texas with status suspended.

2

Highpeak Solar, LLC is the reported developer.

3

The reported queue phase is In Progress (unknown study); proposed COD is 2026-02-28.

Market and operating context

Queue date
2023-10-02
Proposed COD
2026-02-28
IA status
In Progress (unknown study)
Study phase
In Progress (unknown study)

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Wildhorse POD Solar — verified asset snapshot

FieldValue
Queue IDERCOT-23INR0537
LocationHoward, Texas
TechnologySolar
DeveloperHighpeak Solar, LLC
Market / regionERCOT
Point of interconnectionTDSP Station Code: WHPOD_x000D_ PTI BUS #: 1397_x000D_ Load/Load TR: LDWHPOD_x000D_ Voltage Level (Transmission): 138kV
Queue date2023-10-02
Proposed COD2026-02-28