Query
Wildcat Solar Power Plant
Type
Entity Briefing
Entity
Wildcat Solar Power Plant
Summary generated
Oct 11, 2026
First saved
Date not recorded

Briefing on Wildcat Solar Power Plant

Entity Briefing

Summary generated Oct 11, 2026 (UTC).

Source dates used by this summary were not recorded.

90 MW
Proposed capacity
suspended
Current status
Solar+Battery
Technology
West
Market / region
2023-05-01
Proposed COD
Suspended
Queue phase
Briefing/projectsuspended

Wildcat Solar Power Plant is a 90 MW Solar+Battery project in New Mexico, currently suspended.

The reported queue phase is Suspended. Proposed COD is 2023-05-01.

Queue ID
PNM-IA-PNM-2020-12
Location
Mckinley, New Mexico
Technology
Solar+Battery
Market / region
West
Point of interconnection
YN line 115 kV

What stands out

1

Wildcat Solar Power Plant is a 90 MW Solar+Battery project in New Mexico with status suspended.

2

The reported queue phase is Suspended; proposed COD is 2023-05-01.

Market and operating context

Queue date
2020-10-14
Proposed COD
2023-05-01
IA status
Suspended
Study phase
Suspended
Service type
ERIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Wildcat Solar Power Plant — verified asset snapshot

FieldValue
Queue IDPNM-IA-PNM-2020-12
LocationMckinley, New Mexico
TechnologySolar+Battery
Market / regionWest
Point of interconnectionYN line 115 kV
Queue date2020-10-14
Proposed COD2023-05-01
IA statusSuspended