Briefing/projectsuspended
Wildcat Solar Power Plant is a 90 MW Solar+Battery project in New Mexico, currently suspended.
The reported queue phase is Suspended. Proposed COD is 2023-05-01.
- Queue ID
- PNM-IA-PNM-2020-12
- Location
- Mckinley, New Mexico
- Technology
- Solar+Battery
- Market / region
- West
- Point of interconnection
- YN line 115 kV
What stands out
1
Wildcat Solar Power Plant is a 90 MW Solar+Battery project in New Mexico with status suspended.
2
The reported queue phase is Suspended; proposed COD is 2023-05-01.
Market and operating context
- Queue date
- 2020-10-14
- Proposed COD
- 2023-05-01
- IA status
- Suspended
- Study phase
- Suspended
- Service type
- ERIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.