Wildcat Point Generation Facility is a 1.1 GW Natural Gas Fired Combined Cycle asset in PJM Interconnection, currently Operating.
Wildcat Point Generation Facility is reported in Maryland since 2018 under Old Dominion Electric Coop. Available operating and financial measures include 34.0% capacity factor and 3333 GWh annual generation; $750/kW reported CapEx.
- Location
- Cecil, Maryland
- Technology
- Natural Gas Fired Combined Cycle
- Owner / parent
- Old Dominion Electric Coop
- Operator
- Old Dominion Electric Coop
- Grid
- PJM Interconnection
- Plant ID
- 59220
What stands out
Wildcat Point Generation Facility is a 1.1 GW Natural Gas Fired Combined Cycle asset in Maryland with status Operating.
Latest annual operating measures report 34.0% capacity factor and 3333 GWh annual generation.
Available financial measures include $48.7/MWh OpEx, $750/kW CapEx.
Latest linked story: “Wildcat Point gas-fired power plant up and running in Cecil County” (Delaware Business Now, 2018-05-21).
Market and operating context
- ISO / market
- PJM Interconnection
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- RFC
- State rank
- #2 of 16
- National rank
- #142 of 2,025
Why it matters
For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.