Briefing/projectactive
Wild Horse Desert Solar is a 120 MW Solar+Battery project in Texas, currently active.
Wild Horse Desert Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-07-01.
- Queue ID
- ERCOT-27INR0330
- Location
- Dimmit, Texas
- Technology
- Solar+Battery
- Developer
- Wild Horse Desert Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kV 8613 Big Well - 8212 Dilley Switch
What stands out
1
Wild Horse Desert Solar is a 120 MW Solar+Battery project in Texas with status active.
2
Wild Horse Desert Solar, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-07-01.
Market and operating context
- Queue date
- 2024-12-19
- Proposed COD
- 2028-07-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.