Query
Wild Horse
Type
Entity Briefing
Entity
Wild Horse
Generated
2026-10-17T20:24:37.670Z

Briefing on Wild Horse

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
273 MW
Capacity
Operating
Current status
2006
Operating since
3
Generators
24.7%
Capacity factor
591 GWh
Annual generation
Briefing/plantOperating

Wild Horse is a 273 MW Onshore Wind Turbine asset in Washington, currently Operating.

Wild Horse is reported in Washington since 2006 under PUGET HOLDINGS. Available operating and financial measures include 24.7% capacity factor and 591 GWh annual generation; $1644/kW reported CapEx.

Location
Kittitas, Washington
Technology
Onshore Wind Turbine, Solar Photovoltaic
Owner / parent
PUGET HOLDINGS
Operator
Puget Sound Energy Inc
Grid
Puget Sound Energy
Plant ID
56322

What stands out

1

Wild Horse is a 273 MW Onshore Wind Turbine asset in Washington with status Operating.

2

Latest annual operating measures report 24.7% capacity factor and 591 GWh annual generation.

3

Available financial measures include $13.4/MWh OpEx, $1644/kW CapEx.

4

Latest linked story: “Damaged Vestas turbine set for decommissioning in Washington” (Wind Power Monthly, 2025-07-21).

Market and operating context

Balancing authority
Puget Sound Energy
NERC region
WECC
State rank
#2 of 24
National rank
#147 of 1,442

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.