Briefing/projectactive
Wi-Al-199SB is a 199 MW Solar+Battery project in Texas, currently active.
The reported queue phase is 2025 Cluster. Proposed COD is 2028-09-15.
- Queue ID
- EPE-Q25-LG-6-10-2
- Location
- El Paso, Texas
- Technology
- Solar+Battery
- Market / region
- West
- Point of interconnection
- Alamo 115 kV Substation
What stands out
1
Wi-Al-199SB is a 199 MW Solar+Battery project in Texas with status active.
2
The reported queue phase is 2025 Cluster; proposed COD is 2028-09-15.
Market and operating context
- Queue date
- 2025-06-10
- Proposed COD
- 2028-09-15
- IA status
- In Progress (unknown study)
- Study phase
- 2025 Cluster
- Service type
- NRIS/ERIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.