Query
WHITE WING RANCH SOLAR
Type
Entity Briefing
Entity
WHITE WING RANCH SOLAR
State
WA
Technology
solar
Generated
2026-10-11T06:00:14.621Z

Briefing on WHITE WING RANCH SOLAR

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
400 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
CAISO
Market / region
2026-06-01
Proposed COD
C07
Queue phase
Briefing/projectactive

WHITE WING RANCH SOLAR is a 400 MW Solar+Battery project in Arizona, currently active.

The reported queue phase is C07. Proposed COD is 2026-06-01.

Queue ID
CAISO-1062
Location
Yuma, Arizona
Technology
Solar+Battery
Market / region
CAISO
Point of interconnection
Hoodoo Wash Switchyard 500 kV

What stands out

1

WHITE WING RANCH SOLAR is a 400 MW Solar+Battery project in Arizona with status active.

2

The reported queue phase is C07; proposed COD is 2026-06-01.

3

Latest linked story: “Yuma County, Arizona: BrightNight and LRE progress BESS” (Energy-Storage.News, 2026-02-28).

Market and operating context

Queue date
2014-04-30
Proposed COD
2026-06-01
IA status
IA Executed
Study phase
C07
Service type
ERIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

WHITE WING RANCH SOLAR — verified asset snapshot

FieldValue
Queue IDCAISO-1062
LocationYuma, Arizona
TechnologySolar+Battery
Market / regionCAISO
Point of interconnectionHoodoo Wash Switchyard 500 kV
Queue date2014-04-30
Proposed COD2026-06-01
IA statusIA Executed