Query
Wheatridge Hybrid
Type
Entity Briefing
Entity
Wheatridge Hybrid
Generated
2026-10-17T06:13:52.329Z

Briefing on Wheatridge Hybrid

Entity Briefing
Generated Oct 17, 2026·Dataset freshness not reported
280 MW
Capacity
Operating
Current status
2020
Operating since
3
Generators
27.2%
Capacity factor
668 GWh
Annual generation
Briefing/plantOperating

Wheatridge Hybrid is a 280 MW Batteries asset in Oregon, currently Operating.

Wheatridge Hybrid is reported in Oregon since 2020 under NextEra Energy. Available operating and financial measures include 27.2% capacity factor and 668 GWh annual generation; $25.2/MWh reported energy value.

Location
Morrow, Oregon
Technology
Batteries, Onshore Wind Turbine, Solar Photovoltaic
Owner / parent
NextEra Energy
Operator
Wheatridge Wind Holdings, LLC
Grid
Bonneville Power Administration
Plant ID
62745

What stands out

1

Wheatridge Hybrid is a 280 MW Batteries asset in Oregon with status Operating.

2

Latest annual operating measures report 27.2% capacity factor and 668 GWh annual generation.

3

Available financial measures include $25.2/MWh energy value.

4

Latest linked story: “Earnings call transcript: NextEra Energy Q1 2026 results beat EPS forecast” (Investing.com, 2026-04-28).

Market and operating context

Balancing authority
Bonneville Power Administration
NERC region
WECC
State rank
#5 of 50
National rank
#141 of 1,442

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.