Query
What's the status of the 1 queue project linked to Vertus Energy Storage Plant?
Type
Entity Briefing
Entity
VERTUS ENERGY STORAGE
Technology
battery
Generated
2026-10-13T12:30:45.894Z

Briefing on VERTUS ENERGY STORAGE

Entity Briefing
Generated Oct 13, 2026·Dataset freshness not reported
207 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2026-06-01
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

VERTUS ENERGY STORAGE is a 207 MW Battery project in Texas, currently active.

VERTUS ENERGY STORAGE LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-06-01.

Queue ID
ERCOT-26INR0333
Location
Galveston, Texas
Technology
Battery
Developer
VERTUS ENERGY STORAGE LLC
Market / region
ERCOT
Point of interconnection
Bus Name: TnMainland1, Bus Number: 38830,

What stands out

1

VERTUS ENERGY STORAGE is a 207 MW Battery project in Texas with status active.

2

VERTUS ENERGY STORAGE LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2026-06-01.

Market and operating context

Queue date
2023-10-13
Proposed COD
2026-06-01
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

VERTUS ENERGY STORAGE — verified asset snapshot

FieldValue
Queue IDERCOT-26INR0333
LocationGalveston, Texas
TechnologyBattery
DeveloperVERTUS ENERGY STORAGE LLC
Market / regionERCOT
Point of interconnectionBus Name: TnMainland1, Bus Number: 38830,
Queue date2023-10-13
Proposed COD2026-06-01