Tyson Nick Solar is a 90 MW Solar project in Texas, currently suspended.
Tyson Nick Solar Project is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2025-10-03.
- Queue ID
- ERCOT-20INR0222
- Location
- Lamar, Texas
- Technology
- Solar
- Developer
- Tyson Nick Solar Project
- Market / region
- ERCOT
- Point of interconnection
- 1700 Toco 138kV
What stands out
Tyson Nick Solar is a 90 MW Solar project in Texas with status suspended.
Tyson Nick Solar Project is the reported developer.
The reported queue phase is IA Executed; proposed COD is 2025-10-03.
Latest linked story: “ENGIE to Supply Planet-Friendly Power to AstraZeneca Texas Manufacturing Site” (PR Newswire, 2025-11-12).
Market and operating context
- Queue date
- 2018-12-11
- Proposed COD
- 2025-10-03
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.