Query
What's the status of the 1 queue project linked to Tyson Nick?
Type
Entity Briefing
Entity
Tyson Nick Solar
Generated
2026-10-19T19:00:34.567Z

Briefing on Tyson Nick Solar

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
90 MW
Proposed capacity
suspended
Current status
Solar
Technology
ERCOT
Market / region
2025-10-03
Proposed COD
IA Executed
Queue phase
Briefing/projectsuspended

Tyson Nick Solar is a 90 MW Solar project in Texas, currently suspended.

Tyson Nick Solar Project is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2025-10-03.

Queue ID
ERCOT-20INR0222
Location
Lamar, Texas
Technology
Solar
Developer
Tyson Nick Solar Project
Market / region
ERCOT
Point of interconnection
1700 Toco 138kV

What stands out

1

Tyson Nick Solar is a 90 MW Solar project in Texas with status suspended.

2

Tyson Nick Solar Project is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2025-10-03.

4

Latest linked story: “ENGIE to Supply Planet-Friendly Power to AstraZeneca Texas Manufacturing Site” (PR Newswire, 2025-11-12).

Market and operating context

Queue date
2018-12-11
Proposed COD
2025-10-03
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Tyson Nick Solar — verified asset snapshot

FieldValue
Queue IDERCOT-20INR0222
LocationLamar, Texas
TechnologySolar
DeveloperTyson Nick Solar Project
Market / regionERCOT
Point of interconnection1700 Toco 138kV
Queue date2018-12-11
Proposed COD2025-10-03