Briefing on ESCONDIDO ENERGY CENTER 2

Entity Briefing
Generated Oct 13, 2026·Dataset freshness not reported
33 MW
Proposed capacity
active
Current status
Battery
Technology
CAISO
Market / region
2030-06-01
Proposed COD
C07
Queue phase
Briefing/projectactive

ESCONDIDO ENERGY CENTER 2 is a 33 MW Battery project in California, currently active.

The reported queue phase is C07. Proposed COD is 2030-06-01.

Queue ID
CAISO-1048
Location
San Diego, California
Technology
Battery
Market / region
CAISO
Point of interconnection
Escondido Substation 69 kV

What stands out

1

ESCONDIDO ENERGY CENTER 2 is a 33 MW Battery project in California with status active.

2

The reported queue phase is C07; proposed COD is 2030-06-01.

Market and operating context

Queue date
2014-04-30
Proposed COD
2030-06-01
IA status
IA Executed
Study phase
C07
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

ESCONDIDO ENERGY CENTER 2 — verified asset snapshot

FieldValue
Queue IDCAISO-1048
LocationSan Diego, California
TechnologyBattery
Market / regionCAISO
Point of interconnectionEscondido Substation 69 kV
Queue date2014-04-30
Proposed COD2030-06-01
IA statusIA Executed