Query
What's the status of the 1 queue project linked to Armadillo Solar Center?
Type
Entity Briefing
Entity
Armadillo Solar
Generated
2026-10-14T04:58:08.593Z

Briefing on Armadillo Solar

Entity Briefing
Generated Oct 14, 2026·Dataset freshness not reported
200 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2026-10-27
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Armadillo Solar is a 200 MW Solar project in Texas, currently active.

Armadillo Solar Center, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-10-27.

Queue ID
ERCOT-21INR0421
Location
Navarro, Texas
Technology
Solar
Developer
Armadillo Solar Center, LLC
Market / region
ERCOT
Point of interconnection
3387 Revolution 138kV

What stands out

1

Armadillo Solar is a 200 MW Solar project in Texas with status active.

2

Armadillo Solar Center, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2026-10-27.

4

Latest linked story: “Ørsted signs power purchase agreement with MSD” (Orsted, 2021-04-26).

Market and operating context

Queue date
2019-08-28
Proposed COD
2026-10-27
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Armadillo Solar — verified asset snapshot

FieldValue
Queue IDERCOT-21INR0421
LocationNavarro, Texas
TechnologySolar
DeveloperArmadillo Solar Center, LLC
Market / regionERCOT
Point of interconnection3387 Revolution 138kV
Queue date2019-08-28
Proposed COD2026-10-27