3 MW
Capacity
Operating
Current status
2024
Operating since
2
Generators
66.2%
Capacity factor
16 GWh
Annual generation
Briefing/plantOperating

Western Berks is a 3 MW Landfill Gas asset in PJM Interconnection, currently Operating.

Western Berks is reported in Pennsylvania since 2024 under NextEra Renewable Fuels, LLC. Available operating and financial measures include 66.2% capacity factor and 16 GWh annual generation; $2592/kW reported CapEx.

Location
Berks, Pennsylvania
Technology
Landfill Gas
Owner / parent
NextEra Renewable Fuels, LLC
Operator
NextEra Renewable Fuels, LLC
Grid
PJM Interconnection
Plant ID
68608

What stands out

1

Western Berks is a 3 MW Landfill Gas asset in Pennsylvania with status Operating.

2

Latest annual operating measures report 66.2% capacity factor and 16 GWh annual generation.

3

Available financial measures include $2592/kW CapEx.

Market and operating context

ISO / market
PJM Interconnection
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
State rank
#18 of 22
National rank
#181 of 282

Why it matters

For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.