West End Dam Hydroelectric Project is a 4 MW Conventional Hydroelectric asset in NYISO (New York), currently Operating.
West End Dam Hydroelectric Project is reported in New York since 1985 under Relevate Power Management LLC. Available operating and financial measures include 59.3% capacity factor and 23 GWh annual generation; $2294/kW reported CapEx.
- Location
- Jefferson, New York
- Technology
- Conventional Hydroelectric
- Owner / parent
- Relevate Power Management LLC
- Operator
- Relevate Power Management LLC
- Grid
- NYISO (New York)
- Plant ID
- 50759
What stands out
West End Dam Hydroelectric Project is a 4 MW Conventional Hydroelectric asset in New York with status Operating.
Latest annual operating measures report 59.3% capacity factor and 23 GWh annual generation.
Available financial measures include $2294/kW CapEx.
Market and operating context
- ISO / market
- NYISO (New York)
- Balancing authority
- New York Independent System Operator
- NERC region
- NPCC
- State rank
- #82 of 165
- National rank
- #922 of 1,462
Why it matters
For this asset in NYISO (New York), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.