Wellhead Electric Company includes 678 MW of operating capacity in the current result.
11 operating plants span 1 states. No linked queue projects were returned in the current result. Natural Gas is the largest operating technology group at 506 MW.
- Coverage
- 11 plants across 1 states
- Largest asset
- Stanton Energy Reliability Center Hybrid · 161 MW
- Leading technology
- Natural Gas · 506 MW
What stands out
11 operating plants total 678 MW across 1 states.
Natural Gas is the largest operating technology group at 506 MW across 7 plants.
Stanton Energy Reliability Center Hybrid is the largest returned operating asset at 161 MW.
Latest linked story: “California Fast-Tracks Fresno Solar-Battery Project with Regulatory-Easing Measure” (ENR, 2025-03-28).
Market and operating context
- Largest state footprint
- California · 678 MW
- Technology concentration
- Natural Gas represents 506 MW
Why it matters
The operating footprint shows what exists today, while the queue pipeline and latest curated events show where the portfolio or market may be changing. Reading those layers together avoids treating proposed capacity as operating capacity.