Wellesley College Central Utility Plant is a 14 MW Natural Gas Internal Combustion Engine asset in ISO New England, currently Out of service.
Wellesley College Central Utility Plant is reported in Massachusetts since 1985 under Wellesley College. Available operating and financial measures include 0.7% capacity factor and 1 GWh annual generation; $965/kW reported CapEx.
- Location
- Norfolk, Massachusetts
- Technology
- Natural Gas Internal Combustion Engine, Petroleum Liquids
- Owner / parent
- Wellesley College
- Operator
- Wellesley College
- Grid
- ISO New England
- Plant ID
- 54937
What stands out
Wellesley College Central Utility Plant is a 14 MW Natural Gas Internal Combustion Engine asset in Massachusetts with status Out of service.
Latest annual operating measures report 0.7% capacity factor and 1 GWh annual generation.
Available financial measures include $965/kW CapEx.
Latest linked story: “Decarbonizing Wellesley’s electrical grid: Here’s the plan and how you can help” (The Swellesley Report, 2022-11-22).
Market and operating context
- ISO / market
- ISO New England
- Balancing authority
- ISO New England Inc.
- NERC region
- NPCC
- State rank
- #24 of 40
- National rank
- #1430 of 2,025
Why it matters
For this asset in ISO New England, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.