Briefing on WED Coventry 4

Entity Briefing

Summary generated Oct 19, 2026 (UTC).

Source dates used by this summary were not recorded.

2 MW
Capacity
Operating
Current status
2016
Operating since
1
Generators
17.2%
Capacity factor
2 GWh
Annual generation
Briefing/plantOperating

WED Coventry 4 is a 2 MW Onshore Wind Turbine asset in ISO New England, currently Operating.

WED Coventry 4 is reported in Rhode Island since 2016 under WED Coventry Four, LLC. Available operating and financial measures include 17.2% capacity factor and 2 GWh annual generation; $1646/kW reported CapEx.

Location
Kent, Rhode Island
Technology
Onshore Wind Turbine
Owner / parent
WED Coventry Four, LLC
Operator
WED Coventry Four, LLC
Grid
ISO New England
Plant ID
59306

What stands out

1

WED Coventry 4 is a 2 MW Onshore Wind Turbine asset in Rhode Island with status Operating.

2

Latest annual operating measures report 17.2% capacity factor and 2 GWh annual generation.

3

Available financial measures include $1646/kW CapEx.

Market and operating context

ISO / market
ISO New England
Balancing authority
ISO New England Inc.
NERC region
NPCC
State rank
#17 of 20
National rank
#1405 of 1,442

Why it matters

For this asset in ISO New England, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.