Query
WCROC Wind Farm
Type
Entity Briefing
Entity
WCROC Wind Farm
Technology
wind
Summary generated
Oct 19, 2026
First saved
Date not recorded

Briefing on WCROC Wind Farm

Entity Briefing

Summary generated Oct 19, 2026 (UTC).

Source dates used by this summary were not recorded.

2 MW
Capacity
Operating
Current status
2005
Operating since
1
Generators
26.9%
Capacity factor
4 GWh
Annual generation
Briefing/plantOperating

WCROC Wind Farm is a 2 MW Onshore Wind Turbine asset in MISO (Midcontinent), currently Operating.

WCROC Wind Farm is reported in Minnesota since 2005 under University of Minnesota WCROC. Available operating and financial measures include 26.9% capacity factor and 4 GWh annual generation; $1895/kW reported CapEx.

Location
Stevens, Minnesota
Technology
Onshore Wind Turbine
Owner / parent
University of Minnesota WCROC
Operator
University of Minnesota WCROC
Grid
MISO (Midcontinent)
Plant ID
57823

What stands out

1

WCROC Wind Farm is a 2 MW Onshore Wind Turbine asset in Minnesota with status Operating.

2

Latest annual operating measures report 26.9% capacity factor and 4 GWh annual generation.

3

Available financial measures include $1895/kW CapEx.

Market and operating context

ISO / market
MISO (Midcontinent)
Balancing authority
Midcontinent Independent Transmission System Operator, Inc..
NERC region
MRO
State rank
#106 of 123
National rank
#1383 of 1,442

Why it matters

For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.