Query
watermelon 8 energy storage
Type
Entity Briefing
Entity
watermelon 8 energy storage
Technology
battery
Generated
2026-10-06T16:03:40.440Z

Briefing on watermelon 8 energy storage

Entity Briefing
Generated Oct 6, 2026·Dataset freshness not reported
102 MW
Proposed capacity
active
Current status
Battery
Technology
ERCOT
Market / region
2029-03-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

watermelon 8 energy storage is a 102 MW Battery project in Texas, currently active.

Tempus power management LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-03-01.

Queue ID
ERCOT-28INR0258
Location
Dallas, Texas
Technology
Battery
Developer
Tempus power management LLC
Market / region
ERCOT
Point of interconnection
Tap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1.

What stands out

1

watermelon 8 energy storage is a 102 MW Battery project in Texas with status active.

2

Tempus power management LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-03-01.

Market and operating context

Queue date
2025-02-14
Proposed COD
2029-03-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

watermelon 8 energy storage — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0258
LocationDallas, Texas
TechnologyBattery
DeveloperTempus power management LLC
Market / regionERCOT
Point of interconnectionTap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1.
Queue date2025-02-14
Proposed COD2029-03-01