Query
Waterloo Hydroelectric Project
Type
Entity Briefing
Entity
Waterloo Hydroelectric Project
Technology
hydro
Summary generated
Oct 20, 2026
First saved
Date not recorded

Briefing on Waterloo Hydroelectric Project

Entity Briefing

Summary generated Oct 20, 2026 (UTC).

Source dates used by this summary were not recorded.

2 MW
Capacity
Operating
Current status
1915
Operating since
3
Generators
24.0%
Capacity factor
3 GWh
Annual generation
Briefing/plantOperating

Waterloo Hydroelectric Project is a 2 MW Conventional Hydroelectric asset in NYISO (New York), currently Operating.

Waterloo Hydroelectric Project is reported in New York since 1915 under C-S Canal Hydro, LLC. Available operating and financial measures include 24.0% capacity factor and 3 GWh annual generation; $2294/kW reported CapEx.

Location
Seneca, New York
Technology
Conventional Hydroelectric
Owner / parent
C-S Canal Hydro, LLC
Operator
C-S Canal Hydro, LLC
Grid
NYISO (New York)
Plant ID
61642

What stands out

1

Waterloo Hydroelectric Project is a 2 MW Conventional Hydroelectric asset in New York with status Operating.

2

Latest annual operating measures report 24.0% capacity factor and 3 GWh annual generation.

3

Available financial measures include $2294/kW CapEx.

Market and operating context

ISO / market
NYISO (New York)
Balancing authority
New York Independent System Operator
NERC region
NPCC
State rank
#145 of 165
National rank
#1320 of 1,462

Why it matters

For this asset in NYISO (New York), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.