Query
Waterloo Hydroelectric Project
Type
Entity Briefing
Entity
Waterloo Hydroelectric Project
Generated
2026-10-13T12:21:14.249Z

Briefing on Waterloo Hydroelectric Project

Entity Briefing
Generated Oct 13, 2026·Dataset freshness not reported
2 MW
Capacity
Operating
Current status
1915
Operating since
3
Generators
24.0%
Capacity factor
3 GWh
Annual generation
Briefing/plantOperating

Waterloo Hydroelectric Project is a 2 MW Conventional Hydroelectric asset in NYISO (New York), currently Operating.

Waterloo Hydroelectric Project is reported in New York since 1915 under C-S Canal Hydro, LLC. Available operating and financial measures include 24.0% capacity factor and 3 GWh annual generation; $2294/kW reported CapEx.

Location
Seneca, New York
Technology
Conventional Hydroelectric
Owner / parent
C-S Canal Hydro, LLC
Operator
C-S Canal Hydro, LLC
Grid
NYISO (New York)
Plant ID
61642

What stands out

1

Waterloo Hydroelectric Project is a 2 MW Conventional Hydroelectric asset in New York with status Operating.

2

Latest annual operating measures report 24.0% capacity factor and 3 GWh annual generation.

3

Available financial measures include $2294/kW CapEx.

Market and operating context

ISO / market
NYISO (New York)
Balancing authority
New York Independent System Operator
NERC region
NPCC
State rank
#145 of 165
National rank
#1320 of 1,462

Why it matters

For this asset in NYISO (New York), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.