Query
Waterloo BESS 1
Type
Entity Briefing
Entity
Waterloo BESS 1
State
TN
Technology
battery
Generated
2026-10-19T08:22:24.944Z

Briefing on Waterloo BESS 1

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
106 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2027-12-01
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Waterloo BESS 1 is a 106 MW Solar+Battery project in Texas, currently active.

Waterloo Solar, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2027-12-01.

Queue ID
ERCOT-25INR0447
Location
Bastrop, Texas
Technology
Solar+Battery
Developer
Waterloo Solar, LLC
Market / region
ERCOT
Point of interconnection
Tap 345kV 7040 AUSTROP - 7048 GARFIELD

What stands out

1

Waterloo BESS 1 is a 106 MW Solar+Battery project in Texas with status active.

2

Waterloo Solar, LLC is the reported developer.

3

The reported queue phase is IA Executed; proposed COD is 2027-12-01.

Market and operating context

Queue date
2023-05-15
Proposed COD
2027-12-01
IA status
IA Executed
Study phase
IA Executed

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Waterloo BESS 1 — verified asset snapshot

FieldValue
Queue IDERCOT-25INR0447
LocationBastrop, Texas
TechnologySolar+Battery
DeveloperWaterloo Solar, LLC
Market / regionERCOT
Point of interconnectionTap 345kV 7040 AUSTROP - 7048 GARFIELD
Queue date2023-05-15
Proposed COD2027-12-01