Watchtower Educational Center is a 2 MW Natural Gas Internal Combustion Engine asset in NYISO (New York), currently Standby.
Watchtower Educational Center is reported in New York since 1993 under Watchtower Bible & Tract Soc-NY. Available operating and financial measures include 0.1% capacity factor and 0 GWh annual generation; $965/kW reported CapEx.
- Location
- Putnam, New York
- Technology
- Natural Gas Internal Combustion Engine, Petroleum Liquids
- Owner / parent
- Watchtower Bible & Tract Soc-NY
- Operator
- Watchtower Bible & Tract Soc-NY
- Grid
- NYISO (New York)
- Plant ID
- 55619
What stands out
Watchtower Educational Center is a 2 MW Natural Gas Internal Combustion Engine asset in New York with status Standby.
Latest annual operating measures report 0.1% capacity factor and 0 GWh annual generation.
Available financial measures include $965/kW CapEx.
Market and operating context
- ISO / market
- NYISO (New York)
- Balancing authority
- New York Independent System Operator
- NERC region
- NPCC
- State rank
- #92 of 103
- National rank
- #1789 of 2,025
Why it matters
For this asset in NYISO (New York), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.