Briefing/projectactive
Wang Solar SLF is a 145 MW Solar+Battery project in Texas, currently active.
BT Yixin Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2026-03-31.
- Queue ID
- ERCOT-20INR0106
- Location
- Falls, Texas
- Technology
- Solar+Battery
- Developer
- BT Yixin Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- tap 345kV 3409 LakeCr1 - 3414 TempSS
What stands out
1
Wang Solar SLF is a 145 MW Solar+Battery project in Texas with status active.
2
BT Yixin Solar, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2026-03-31.
Market and operating context
- Queue date
- 2018-06-14
- Proposed COD
- 2026-03-31
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.