Briefing on Wang Solar SLF

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
145 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2026-03-31
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Wang Solar SLF is a 145 MW Solar+Battery project in Texas, currently active.

BT Yixin Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2026-03-31.

Queue ID
ERCOT-20INR0106
Location
Falls, Texas
Technology
Solar+Battery
Developer
BT Yixin Solar, LLC
Market / region
ERCOT
Point of interconnection
tap 345kV 3409 LakeCr1 - 3414 TempSS

What stands out

1

Wang Solar SLF is a 145 MW Solar+Battery project in Texas with status active.

2

BT Yixin Solar, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2026-03-31.

Market and operating context

Queue date
2018-06-14
Proposed COD
2026-03-31
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Wang Solar SLF — verified asset snapshot

FieldValue
Queue IDERCOT-20INR0106
LocationFalls, Texas
TechnologySolar+Battery
DeveloperBT Yixin Solar, LLC
Market / regionERCOT
Point of interconnectiontap 345kV 3409 LakeCr1 - 3414 TempSS
Queue date2018-06-14
Proposed COD2026-03-31