Wanapum is a 1.2 GW Conventional Hydroelectric asset in Washington, currently Operating.
Wanapum is reported in Washington since 2011 under PUD No 2 of Grant County - (WA). Available operating and financial measures include 41.5% capacity factor and 4438 GWh annual generation; $2294/kW reported CapEx.
- Location
- Grant, Washington
- Technology
- Conventional Hydroelectric
- Owner / parent
- PUD No 2 of Grant County - (WA)
- Operator
- PUD No 2 of Grant County - (WA)
- Grid
- Public Utility District No. 2 of Grant County, Washington
- Plant ID
- 3888
What stands out
Wanapum is a 1.2 GW Conventional Hydroelectric asset in Washington with status Operating.
Latest annual operating measures report 41.5% capacity factor and 4438 GWh annual generation.
Available financial measures include $2294/kW CapEx.
Latest linked story: “This Washington state dam is trying to be fish-friendly” (WHYY, 2017-04-03).
Market and operating context
- Balancing authority
- Public Utility District No. 2 of Grant County, Washington
- NERC region
- WECC
- State rank
- #4 of 73
- National rank
- #13 of 1,462
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.