Briefing/projectactive
Walleye Solar is a 215 MW Solar project in Texas, currently active.
Sandow Lakes Ranch Solar II, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-10-01.
- Queue ID
- ERCOT-20INR0127
- Location
- Milam, Texas
- Technology
- Solar
- Developer
- Sandow Lakes Ranch Solar II, LLC
- Market / region
- ERCOT
- Point of interconnection
- 138kV Walleye Creek Switch 3712
What stands out
1
Walleye Solar is a 215 MW Solar project in Texas with status active.
2
Sandow Lakes Ranch Solar II, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-10-01.
Market and operating context
- Queue date
- 2018-07-03
- Proposed COD
- 2027-10-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.