Query
Walker Solar Two
Type
Entity Briefing
Entity
Walker Solar Two
Generated
2026-10-05T06:24:09.691Z

Briefing on Walker Solar Two

Entity Briefing
Generated Oct 5, 2026·Dataset freshness not reported
80 MW
Proposed capacity
active
Current status
Solar
Technology
PJM
Market / region
2026-09-19
Proposed COD
IA Executed
Queue phase
Briefing/projectactive

Walker Solar Two is a 80 MW Solar project in Pennsylvania, currently active.

The reported queue phase is IA Executed. Proposed COD is 2026-09-19.

Queue ID
PJM-AF2-361
Location
Juniata, Pennsylvania
Technology
Solar
Market / region
PJM
Point of interconnection
Mifflintown Tap 69 kV

What stands out

1

Walker Solar Two is a 80 MW Solar project in Pennsylvania with status active.

2

The reported queue phase is IA Executed; proposed COD is 2026-09-19.

Market and operating context

Queue date
2020-03-31
Proposed COD
2026-09-19
IA status
IA Executed
Study phase
IA Executed
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Walker Solar Two — verified asset snapshot

FieldValue
Queue IDPJM-AF2-361
LocationJuniata, Pennsylvania
TechnologySolar
Market / regionPJM
Point of interconnectionMifflintown Tap 69 kV
Queue date2020-03-31
Proposed COD2026-09-19
IA statusIA Executed