Wake Wind Energy is a 251 MW Wind project in Texas, currently active.
WAKE WIND ENERGY is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-05-01.
- Queue ID
- ERCOT-26INR0647
- Location
- Crosby, Texas
- Technology
- Wind
- Developer
- WAKE WIND ENERGY
- Market / region
- ERCOT
- Point of interconnection
- 59904 Cottonwood 345
What stands out
Wake Wind Energy is a 251 MW Wind project in Texas with status active.
WAKE WIND ENERGY is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2027-05-01.
Latest linked story: “PGE wants to add solar to troubled wind farm instead of replacing turbines” (OregonLive.com, 2025-06-29).
Market and operating context
- Queue date
- 2025-04-21
- Proposed COD
- 2027-05-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.