Voyager Storage is a 50 MW Battery project in Texas, currently active.
EDF Renewables is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-04-08.
- Queue ID
- ERCOT-20INR0238
- Location
- Wharton, Texas
- Technology
- Battery
- Developer
- EDF Renewables
- Market / region
- ERCOT
- Point of interconnection
- 44200 Hillje 345kV
What stands out
Voyager Storage is a 50 MW Battery project in Texas with status active.
EDF Renewables is the reported developer.
The reported queue phase is Facility Study; proposed COD is 2028-04-08.
Latest linked story: “Jupiter Power, Consumers Energy Celebrate Michigan's First Operational Utility-Scale Battery Energy Storage System” (PR Newswire, 2025-09-18).
Market and operating context
- Queue date
- 2019-01-14
- Proposed COD
- 2028-04-08
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.