Briefing/projectactive
VISOL 1 SOLAR is a 95 MW Solar project in Texas, currently active.
VISOL 1 SOLAR, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-06-30.
- Queue ID
- ERCOT-25INR0546
- Location
- Val Verde, Texas
- Technology
- Solar
- Developer
- VISOL 1 SOLAR, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kV 8683 Comstock - 60389 Corral
What stands out
1
VISOL 1 SOLAR is a 95 MW Solar project in Texas with status active.
2
VISOL 1 SOLAR, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-06-30.
Market and operating context
- Queue date
- 2023-10-25
- Proposed COD
- 2028-06-30
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.