Briefing/projectactive
Vertus Energy Storage 2 is a 205 MW Battery project in Texas, currently active.
Vertus Energy Storage 2 LLC is the reported developer. Proposed COD is 2028-02-15.
- Queue ID
- ERCOT-28INR0490
- Location
- Galveston, Texas
- Technology
- Battery
- Developer
- Vertus Energy Storage 2 LLC
- Market / region
- ERCOT
- Point of interconnection
- 38830 TNMAINLAND1 138 KV
What stands out
1
Vertus Energy Storage 2 is a 205 MW Battery project in Texas with status active.
2
Vertus Energy Storage 2 LLC is the reported developer.
3
proposed COD is 2028-02-15.
Market and operating context
- Queue date
- 2026-01-26
- Proposed COD
- 2028-02-15
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.