Briefing/projectactive
Velveteen Solar III is a 201 MW Solar project in Texas, currently active.
Velveteen Solar III, LLC is the reported developer. Proposed COD is 2029-12-15.
- Queue ID
- ERCOT-29INR0226
- Location
- Baylor, Texas
- Technology
- Solar
- Developer
- Velveteen Solar III, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap into 6076 FOXTAIL- 6100 OKLAUNION
What stands out
1
Velveteen Solar III is a 201 MW Solar project in Texas with status active.
2
Velveteen Solar III, LLC is the reported developer.
3
proposed COD is 2029-12-15.
Market and operating context
- Queue date
- 2026-01-13
- Proposed COD
- 2029-12-15
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.