Briefing/projectactive
Velveteen Solar II is a 306 MW Solar project in Texas, currently active.
Velveteen Solar II, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-12-15.
- Queue ID
- ERCOT-29INR0225
- Location
- Baylor, Texas
- Technology
- Solar
- Developer
- Velveteen Solar II, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap into 6076 FOXTAIL- 6100 OKLAUNION
What stands out
1
Velveteen Solar II is a 306 MW Solar project in Texas with status active.
2
Velveteen Solar II, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-12-15.
Market and operating context
- Queue date
- 2025-12-23
- Proposed COD
- 2029-12-15
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.