Query
Velveteen Solar II
Type
Entity Briefing
Entity
Velveteen Solar II
Generated
2026-10-19T16:17:18.233Z

Briefing on Velveteen Solar II

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
306 MW
Proposed capacity
active
Current status
Solar
Technology
ERCOT
Market / region
2029-12-15
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Velveteen Solar II is a 306 MW Solar project in Texas, currently active.

Velveteen Solar II, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-12-15.

Queue ID
ERCOT-29INR0225
Location
Baylor, Texas
Technology
Solar
Developer
Velveteen Solar II, LLC
Market / region
ERCOT
Point of interconnection
Tap into 6076 FOXTAIL- 6100 OKLAUNION

What stands out

1

Velveteen Solar II is a 306 MW Solar project in Texas with status active.

2

Velveteen Solar II, LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-12-15.

Market and operating context

Queue date
2025-12-23
Proposed COD
2029-12-15
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Velveteen Solar II — verified asset snapshot

FieldValue
Queue IDERCOT-29INR0225
LocationBaylor, Texas
TechnologySolar
DeveloperVelveteen Solar II, LLC
Market / regionERCOT
Point of interconnectionTap into 6076 FOXTAIL- 6100 OKLAUNION
Queue date2025-12-23
Proposed COD2029-12-15