Briefing on Velociraptor Solar II

Entity Briefing
Generated Oct 19, 2026·Dataset freshness not reported
252 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2029-12-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Velociraptor Solar II is a 252 MW Solar+Battery project in Texas, currently active.

Greyhound Solar 3 LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-12-01.

Queue ID
ERCOT-28INR0322
Location
Ector, Texas
Technology
Solar+Battery
Developer
Greyhound Solar 3 LLC
Market / region
ERCOT
Point of interconnection
Tap south bus Odessa EHV SW (11028) - Wolf Switch (11010) 345KV section at (31.740371, -102.502076)

What stands out

1

Velociraptor Solar II is a 252 MW Solar+Battery project in Texas with status active.

2

Greyhound Solar 3 LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-12-01.

Market and operating context

Queue date
2025-05-27
Proposed COD
2029-12-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Velociraptor Solar II — verified asset snapshot

FieldValue
Queue IDERCOT-28INR0322
LocationEctor, Texas
TechnologySolar+Battery
DeveloperGreyhound Solar 3 LLC
Market / regionERCOT
Point of interconnectionTap south bus Odessa EHV SW (11028) - Wolf Switch (11010) 345KV section at (31.740371, -102.502076)
Queue date2025-05-27
Proposed COD2029-12-01