Briefing/projectactive
Velociraptor BESS II is a 261 MW Solar+Battery project in Texas, currently active.
Greyhound BESS 3 LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-12-01.
- Queue ID
- ERCOT-28INR0323
- Location
- Ector, Texas
- Technology
- Solar+Battery
- Developer
- Greyhound BESS 3 LLC
- Market / region
- ERCOT
- Point of interconnection
- #11028 Odessa EHV SW - #11010 Wolf Switch 345K
What stands out
1
Velociraptor BESS II is a 261 MW Solar+Battery project in Texas with status active.
2
Greyhound BESS 3 LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-12-01.
Market and operating context
- Queue date
- 2025-05-27
- Proposed COD
- 2029-12-01
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.