261 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
ERCOT
Market / region
2029-12-01
Proposed COD
Facility Study
Queue phase
Briefing/projectactive

Velociraptor BESS I is a 261 MW Solar+Battery project in Texas, currently active.

Greyhound BESS 2 LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-12-01.

Queue ID
ERCOT-27INR0493
Location
Ector, Texas
Technology
Solar+Battery
Developer
Greyhound BESS 2 LLC
Market / region
ERCOT
Point of interconnection
10012 METEOR_5 Substation 345kV

What stands out

1

Velociraptor BESS I is a 261 MW Solar+Battery project in Texas with status active.

2

Greyhound BESS 2 LLC is the reported developer.

3

The reported queue phase is Facility Study; proposed COD is 2029-12-01.

Market and operating context

Queue date
2025-05-27
Proposed COD
2029-12-01
IA status
Facility Study
Study phase
Facility Study

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Velociraptor BESS I — verified asset snapshot

FieldValue
Queue IDERCOT-27INR0493
LocationEctor, Texas
TechnologySolar+Battery
DeveloperGreyhound BESS 2 LLC
Market / regionERCOT
Point of interconnection10012 METEOR_5 Substation 345kV
Queue date2025-05-27
Proposed COD2029-12-01