Briefing/projectactive
Velado Storage SLF is a 115 MW Solar+Battery project in Texas, currently active.
Velado Solar, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2028-09-14.
- Queue ID
- ERCOT-27INR0374
- Location
- Dimmit, Texas
- Technology
- Solar+Battery
- Developer
- Velado Solar, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 138kv 78281 Dimmit - 8274 Conoco Chittam.
What stands out
1
Velado Storage SLF is a 115 MW Solar+Battery project in Texas with status active.
2
Velado Solar, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2028-09-14.
Market and operating context
- Queue date
- 2024-11-19
- Proposed COD
- 2028-09-14
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.