Briefing/projectactive
Vaquero 1 Wind is a 400 MW Wind project in Texas, currently active.
Enerverse is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2027-01-15.
- Queue ID
- ERCOT-17INR0043
- Location
- Zapata, Texas
- Technology
- Wind
- Developer
- Enerverse
- Market / region
- ERCOT
- Point of interconnection
- tap 345kV 8905 N Edinb - 8455 Lon Hill
What stands out
1
Vaquero 1 Wind is a 400 MW Wind project in Texas with status active.
2
Enerverse is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2027-01-15.
4
Latest linked story: “Enbridge to move ahead with two renewables projects in Wyoming, Texas” (Renewables Now, 2026-03-09).
Market and operating context
- Queue date
- 2016-04-01
- Proposed COD
- 2027-01-15
- IA status
- Facility Study
- Study phase
- Facility Study
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.