Val Vista Grid BESS 2 is a 211 MW Battery project in Texas, currently active.
Val Vista Grid, LLC is the reported developer. The reported queue phase is Facility Study. Proposed COD is 2029-03-30.
- Queue ID
- ERCOT-24INR0102
- Location
- Hidalgo, Texas
- Technology
- Battery
- Developer
- Val Vista Grid, LLC
- Market / region
- ERCOT
- Point of interconnection
- Tap 345kV 8383 North Edinburg - 80137 Stewart Road
What stands out
1
Val Vista Grid BESS 2 is a 211 MW Battery project in Texas with status active.
2
Val Vista Grid, LLC is the reported developer.
3
The reported queue phase is Facility Study; proposed COD is 2029-03-30.
Market and operating context
- Queue date
- 2021-10-01
- Proposed COD
- 2029-03-30
- IA status
- Facility Study
- Study phase
- Facility Study