UW Parkside is a 2 MW Solar Photovoltaic asset in MISO (Midcontinent), currently Operating.
UW Parkside is reported in Wisconsin since 2020 under WEC Energy Group. Available operating and financial measures include 19.4% capacity factor and 4 GWh annual generation; $1552/kW reported CapEx.
- Location
- Kenosha, Wisconsin
- Technology
- Solar Photovoltaic
- Owner / parent
- WEC Energy Group
- Operator
- Wisconsin Electric Power Co
- Grid
- MISO (Midcontinent)
- Plant ID
- 67395
What stands out
UW Parkside is a 2 MW Solar Photovoltaic asset in Wisconsin with status Operating.
Latest annual operating measures report 19.4% capacity factor and 4 GWh annual generation.
Available financial measures include $30.3/MWh OpEx, $1552/kW CapEx.
Market and operating context
- ISO / market
- MISO (Midcontinent)
- Balancing authority
- Midcontinent Independent Transmission System Operator, Inc..
- NERC region
- RFC
- State rank
- #89 of 132
- National rank
- #5078 of 7,971
Why it matters
For this asset in MISO (Midcontinent), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.