Briefing/projectactive
Utopia BESS is a 10 MW Battery project in Texas, currently active.
Regis Utopia, LLC is the reported developer. The reported queue phase is IA Executed. Proposed COD is 2026-05-04.
- Queue ID
- ERCOT-24INR0501
- Location
- Bandera, Texas
- Technology
- Battery
- Developer
- Regis Utopia, LLC
- Market / region
- ERCOT
- Point of interconnection
- Station Name (TDSP Station Code): UTOPIA; Load/Load Transformer Name: UTOPIAT1; PTI BUS number: 7428; Voltage in kV (Transmission Level): 69kV Transformers: 3x 4000kVA 800VAC Δ - 12.47kVA Υ 12,000 MVA connected, Running load limited to 9.99 MW
What stands out
1
Utopia BESS is a 10 MW Battery project in Texas with status active.
2
Regis Utopia, LLC is the reported developer.
3
The reported queue phase is IA Executed; proposed COD is 2026-05-04.
Market and operating context
- Queue date
- 2022-11-29
- Proposed COD
- 2026-05-04
- IA status
- IA Executed
- Study phase
- IA Executed
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.