Query
Urtica Solar Project
Type
Entity Briefing
Entity
Urtica Solar Project
Summary generated
Oct 17, 2026
First saved
Date not recorded

Briefing on Urtica Solar Project

Entity Briefing

Summary generated Oct 17, 2026 (UTC).

Source dates used by this summary were not recorded.

5 MW
Capacity
Operating
Current status
2022
Operating since
1
Generators
24.1%
Capacity factor
11 GWh
Annual generation
Briefing/plantOperating

Urtica Solar Project is a 5 MW Solar Photovoltaic asset in Washington, currently Operating.

Urtica Solar Project is reported in Washington since 2022 under Altus Power America Management, LLC. Available operating and financial measures include 24.1% capacity factor and 11 GWh annual generation; $1549/kW reported CapEx.

Location
Kittitas, Washington
Technology
Solar Photovoltaic
Owner / parent
Altus Power America Management, LLC
Operator
Altus Power America Management, LLC
Grid
Puget Sound Energy
Plant ID
62067

What stands out

1

Urtica Solar Project is a 5 MW Solar Photovoltaic asset in Washington with status Operating.

2

Latest annual operating measures report 24.1% capacity factor and 11 GWh annual generation.

3

Available financial measures include $1549/kW CapEx.

Market and operating context

Balancing authority
Puget Sound Energy
NERC region
WECC
State rank
#9 of 12
National rank
#3235 of 7,971

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.