Upper Pacolet Hydro is a 1 MW Conventional Hydroelectric asset in South Carolina, currently Operating.
Upper Pacolet Hydro is reported in South Carolina since 2013 under Lockhart Power Co. Available operating and financial measures include 41.4% capacity factor and 4 GWh annual generation; $3875/kW reported CapEx.
- Location
- Spartanburg, South Carolina
- Technology
- Conventional Hydroelectric
- Owner / parent
- Lockhart Power Co
- Operator
- Lockhart Power Co
- Grid
- Duke Energy Carolinas
- Plant ID
- 58257
What stands out
Upper Pacolet Hydro is a 1 MW Conventional Hydroelectric asset in South Carolina with status Operating.
Latest annual operating measures report 41.4% capacity factor and 4 GWh annual generation.
Available financial measures include $19.3/MWh OpEx, $3875/kW CapEx.
Market and operating context
- Balancing authority
- Duke Energy Carolinas
- NERC region
- SERC
- State rank
- #31 of 32
- National rank
- #1408 of 1,462
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.