Query
Upper Pacolet Hydro
Type
Entity Briefing
Entity
Upper Pacolet Hydro
Technology
hydro
Generated
2026-10-18T02:44:17.645Z

Briefing on Upper Pacolet Hydro

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
1 MW
Capacity
Operating
Current status
2013
Operating since
1
Generators
41.4%
Capacity factor
4 GWh
Annual generation
Briefing/plantOperating

Upper Pacolet Hydro is a 1 MW Conventional Hydroelectric asset in South Carolina, currently Operating.

Upper Pacolet Hydro is reported in South Carolina since 2013 under Lockhart Power Co. Available operating and financial measures include 41.4% capacity factor and 4 GWh annual generation; $3875/kW reported CapEx.

Location
Spartanburg, South Carolina
Technology
Conventional Hydroelectric
Owner / parent
Lockhart Power Co
Operator
Lockhart Power Co
Grid
Duke Energy Carolinas
Plant ID
58257

What stands out

1

Upper Pacolet Hydro is a 1 MW Conventional Hydroelectric asset in South Carolina with status Operating.

2

Latest annual operating measures report 41.4% capacity factor and 4 GWh annual generation.

3

Available financial measures include $19.3/MWh OpEx, $3875/kW CapEx.

Market and operating context

Balancing authority
Duke Energy Carolinas
NERC region
SERC
State rank
#31 of 32
National rank
#1408 of 1,462

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.