Briefing/plantOperating
Upper Malad is a 8 MW Conventional Hydroelectric asset in Idaho, currently Operating.
Upper Malad is reported in Idaho since 1948 under IDACORP. Available operating and financial measures include 80.0% capacity factor and 58 GWh annual generation; $2294/kW reported CapEx.
- Location
- Gooding, Idaho
- Technology
- Conventional Hydroelectric
- Owner / parent
- IDACORP
- Operator
- Idaho Power Co
- Grid
- Idaho Power Company
- Plant ID
- 823
What stands out
1
Upper Malad is a 8 MW Conventional Hydroelectric asset in Idaho with status Operating.
2
Latest annual operating measures report 80.0% capacity factor and 58 GWh annual generation.
3
Available financial measures include $2294/kW CapEx.
Market and operating context
- Balancing authority
- Idaho Power Company
- NERC region
- WECC
- State rank
- #35 of 76
- National rank
- #715 of 1,462
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.