Briefing/plantOperating
Upper Falls is a 10 MW Conventional Hydroelectric asset in Washington, currently Operating.
Upper Falls is reported in Washington since 1922 under Avista. Available operating and financial measures include 68.3% capacity factor and 60 GWh annual generation; $2262/kW reported CapEx.
- Location
- Spokane, Washington
- Technology
- Conventional Hydroelectric
- Owner / parent
- Avista
- Operator
- Avista Corp
- Grid
- Avista Corporation
- Plant ID
- 9096
What stands out
1
Upper Falls is a 10 MW Conventional Hydroelectric asset in Washington with status Operating.
2
Latest annual operating measures report 68.3% capacity factor and 60 GWh annual generation.
3
Available financial measures include $12.5/MWh OpEx, $2262/kW CapEx.
Market and operating context
- Balancing authority
- Avista Corporation
- NERC region
- WECC
- State rank
- #53 of 73
- National rank
- #650 of 1,462
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.