Upper Dawson is a 4 MW Conventional Hydroelectric asset in California, currently Operating.
Upper Dawson is reported in California since 1983 under Turlock Irrigation District Employees Association. Available operating and financial measures include 27.6% capacity factor and 11 GWh annual generation; $2294/kW reported CapEx.
- Location
- Tuolumne, California
- Technology
- Conventional Hydroelectric
- Owner / parent
- Turlock Irrigation District Employees Association
- Operator
- Turlock Irrigation District
- Grid
- Turlock Irrigation District
- Plant ID
- 489
What stands out
Upper Dawson is a 4 MW Conventional Hydroelectric asset in California with status Operating.
Latest annual operating measures report 27.6% capacity factor and 11 GWh annual generation.
Available financial measures include $2294/kW CapEx.
Market and operating context
- Balancing authority
- Turlock Irrigation District
- NERC region
- WECC
- State rank
- #172 of 247
- National rank
- #929 of 1,462
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.