Upper Blackstone (MA) Treasure Valley is a 5 MW Solar Photovoltaic asset in ISO New England, currently Operating.
Upper Blackstone (MA) Treasure Valley is reported in Massachusetts since 2014 under Nexamp Treasure Valley Solar, LLC. Available operating and financial measures include 16.5% capacity factor and 7 GWh annual generation; $30.9/MWh reported energy value.
- Location
- Worcester, Massachusetts
- Technology
- Solar Photovoltaic
- Owner / parent
- Nexamp Treasure Valley Solar, LLC
- Operator
- Nexamp Treasure Valley Solar, LLC
- Grid
- ISO New England
- Plant ID
- 59781
What stands out
Upper Blackstone (MA) Treasure Valley is a 5 MW Solar Photovoltaic asset in Massachusetts with status Operating.
Latest annual operating measures report 16.5% capacity factor and 7 GWh annual generation.
Available financial measures include $30.9/MWh energy value.
Market and operating context
- ISO / market
- ISO New England
- Balancing authority
- ISO New England Inc.
- NERC region
- NPCC
- State rank
- #67 of 525
- National rank
- #2704 of 7,971
Why it matters
For this asset in ISO New England, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.