Upper Beaver Falls Project is a 2 MW Conventional Hydroelectric asset in NYISO (New York), currently Operating.
Upper Beaver Falls Project is reported in New York since 1985 under Eagle Creek Renewable Energy, LLC. Available operating and financial measures include 45.8% capacity factor and 6 GWh annual generation; $2294/kW reported CapEx.
- Location
- Lewis, New York
- Technology
- Conventional Hydroelectric
- Owner / parent
- Eagle Creek Renewable Energy, LLC
- Operator
- Eagle Creek Renewable Energy, LLC
- Grid
- NYISO (New York)
- Plant ID
- 10490
What stands out
Upper Beaver Falls Project is a 2 MW Conventional Hydroelectric asset in New York with status Operating.
Latest annual operating measures report 45.8% capacity factor and 6 GWh annual generation.
Available financial measures include $2294/kW CapEx.
Market and operating context
- ISO / market
- NYISO (New York)
- Balancing authority
- New York Independent System Operator
- NERC region
- NPCC
- State rank
- #149 of 165
- National rank
- #1304 of 1,462
Why it matters
For this asset in NYISO (New York), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.