Briefing/plantOperating
TX Fort Worth 5200 Gold Spike Drive is a 4 MW Solar Photovoltaic asset in ERCOT (Texas), currently Operating.
TX Fort Worth 5200 Gold Spike Drive is reported in Texas since 2025 under Catalyze Fort Worth 5200 Gold Spike Drive Microgrid, LLC. Available operating and financial measures include $1543/kW reported CapEx.
- Location
- Tarrant, Texas
- Technology
- Solar Photovoltaic
- Owner / parent
- Catalyze Fort Worth 5200 Gold Spike Drive Microgrid, LLC
- Operator
- Catalyze Fort Worth 5200 Gold Spike Drive Microgrid, LLC
- Grid
- ERCOT (Texas)
- Plant ID
- 67058
What stands out
1
TX Fort Worth 5200 Gold Spike Drive is a 4 MW Solar Photovoltaic asset in Texas with status Operating.
2
Available financial measures include $1543/kW CapEx.
Market and operating context
- ISO / market
- ERCOT (Texas)
- Balancing authority
- Electric Reliability Council of Texas, Inc.
- NERC region
- TRE
- State rank
- #351 of 378
- National rank
- #4096 of 7,971
Why it matters
For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.